Optimized Approach toward Identification of Influential Cost Overrun Causes in Construction Industry

dc.contributor.authorYoussefi, Iman
dc.contributor.authorCelik, Tolga
dc.date.accessioned2026-02-06T18:43:54Z
dc.date.issued2023
dc.departmentDoğu Akdeniz Üniversitesi
dc.description.abstractPrioritization is considered a core concept in cost overrun analysis. This study first aimed at proposing a new approach for the calculation of total risk magnitude (TRM) and, second, introduced the application of Pareto analysis in the prioritization of cost overrun causes. A case study is delineated to explain the applicability of the aforementioned approaches. Thirty-eight unique causes of cost overrun in urban-related construction projects were identified and a survey was conducted among construction professionals in Iran. The TRM for each cost overrun cause is calculated using single-attribute (SA), double-attribute (DA), and multiple-attribute (MA) approaches. Henceforth, based on calculated TRM, the causes are prioritized using the relative importance index (RII) and Pareto analysis. A comparative analysis revealed that not only could Pareto-based prioritization be effectively employed for prioritization, but also, the proposed MA approach for TRM calculation optimizes the efficiency of the most influential cause identification.
dc.identifier.doi10.1061/AJRUA6.RUENG-982
dc.identifier.issn2376-7642
dc.identifier.issue2
dc.identifier.orcid0000-0003-4403-036X
dc.identifier.scopus2-s2.0-85146423959
dc.identifier.scopusqualityQ2
dc.identifier.urihttps://doi.org/10.1061/AJRUA6.RUENG-982
dc.identifier.urihttps://hdl.handle.net/11129/13818
dc.identifier.volume9
dc.identifier.wosWOS:000971815000003
dc.identifier.wosqualityQ2
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherAsce-Amer Soc Civil Engineers
dc.relation.ispartofAsce-Asme Journal of Risk and Uncertainty in Engineering Systems Part A-Civil Engineering
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.snmzKA_WoS_20260204
dc.subjectCost overrun
dc.subjectRisk prioritization
dc.subjectPareto analysis
dc.subjectFrequency analysis
dc.titleOptimized Approach toward Identification of Influential Cost Overrun Causes in Construction Industry