An optimization model for cyclic scheduling problem in flexible robotic cells

dc.contributor.authorNejad, Mazyar Ghadiri
dc.contributor.authorKovacs, Gergely
dc.contributor.authorVizvari, Bela
dc.contributor.authorBarenji, Reza Vatankhah
dc.date.accessioned2026-02-06T18:34:02Z
dc.date.issued2018
dc.departmentDoğu Akdeniz Üniversitesi
dc.description.abstractThis study deals with scheduling problem of a flexible robotic cell with m-machines and a robot. The machines are identical, and each machine performs all of the processes for producing a finished product. These machines are arranged in a line where one input buffer and one buffer are put at the beginning and the end of the line, respectively. A robot transports parts between the machines and the input and output buffers. In this cell, each machine processes one part in each cycle. Since the cycle time depends on the order of the activities of the robot, for minimizing the cycle time, the order of the activities of the robot should be determined. A universal scheduling model of the problem is developed, and its reduced version is provided, excluding waiting time variables. Furthermore, a new model is proposed for maximizing the minimum robot return time to the machines in a cycle. The developed models numerically examined based on obtained products order from the reduced model for the cell with up to six machines. Moreover, the assignment problem method is used for determining lower bond results of the developed model and/or the optimal results (i.e., in case the operation times of the machines are small enough and the robot waiting time is zero). The results indicate that the reduced version of the model is significantly more efficient compared to the model of the literature.
dc.identifier.doi10.1007/s00170-017-1470-z
dc.identifier.endpage3873
dc.identifier.issn0268-3768
dc.identifier.issn1433-3015
dc.identifier.issue9-12
dc.identifier.orcid0000-0002-8207-2387
dc.identifier.orcid0000-0003-2933-0954
dc.identifier.scopus2-s2.0-85039743018
dc.identifier.scopusqualityQ1
dc.identifier.startpage3863
dc.identifier.urihttps://doi.org/10.1007/s00170-017-1470-z
dc.identifier.urihttps://hdl.handle.net/11129/11607
dc.identifier.volume95
dc.identifier.wosWOS:000428237100055
dc.identifier.wosqualityQ2
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherSpringer London Ltd
dc.relation.ispartofInternational Journal of Advanced Manufacturing Technology
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.snmzKA_WoS_20260204
dc.subjectFlexible robotic cell
dc.subjectCNC machines
dc.subjectRobotic cell
dc.subjectCyclic scheduling
dc.titleAn optimization model for cyclic scheduling problem in flexible robotic cells
dc.typeArticle

Files