A dynamic multi agent based scheduling for flexible flow line manufacturing system: UPVC door and window company

dc.contributor.authorRoudi, Danial
dc.contributor.authorBarenji, Ali Vatankhah
dc.contributor.authorVatankhah Barenji, Reza
dc.contributor.authorHashemipour, Majid
dc.date.accessioned2026-02-06T18:00:48Z
dc.date.issued2016
dc.departmentDoğu Akdeniz Üniversitesi
dc.description6th International Conference on Industrial Engineering and Operations Management in Kuala Lumpur, IEOM 2016 -- 2016-03-08 through 2016-03-10 -- Kuala Lumpur -- 135628
dc.description.abstractDynamic rescheduling decision-making problem is an important issue in modern manufacturing system with the feature of combinational computation complexity. This paper introduces a multi-agent based approach using the detailed process, provided by Prometheus methodology, which used for the design of a simultaneous dynamic rescheduling decision making for flexible flow line manufacturing system that working under dynamic customer demand. The application has been completely modeled with the Prometheus Design Tool (PDT), which offers full support to Prometheus Methodology. The proposed dynamic scheduling decision making system is developed for Automated UPVC door and Windows Company and can be support both static and dynamic scheduling. © IEOM Society International. © IEOM Society International.
dc.description.sponsorshipEATON Powering Business world wide; IEEE; informs; Official Airline Partner Emirates; SIEMENS
dc.identifier.endpage3305
dc.identifier.isbn9781792361258
dc.identifier.isbn9781532359507
dc.identifier.isbn9780985549756
dc.identifier.isbn9780985549770
dc.identifier.isbn9781532359491
dc.identifier.isbn9781792361234
dc.identifier.isbn9781532359453
dc.identifier.isbn9781532359460
dc.identifier.isbn9781532359514
dc.identifier.isbn9781792361265
dc.identifier.scopus2-s2.0-85018417564
dc.identifier.scopusqualityN/A
dc.identifier.startpage3296
dc.identifier.urihttps://hdl.handle.net/11129/8139
dc.identifier.volume8-10 March 2016
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherIEOM Society ieom-society@iieom.org
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.snmzKA_Scopus_20260204
dc.subjectDynamic scheduling
dc.subjectFlow line manufacturing
dc.subjectMulti agent system
dc.titleA dynamic multi agent based scheduling for flexible flow line manufacturing system: UPVC door and window company
dc.typeConference Object

Files