Trade-off between process scheduling and production cost in cyclic flexible robotic cells

dc.contributor.authorNejad, Mazyar Ghadiri
dc.contributor.authorShavarani, Seyed Mahdi
dc.contributor.authorVizvari, Bela
dc.contributor.authorBarenji, Reza Vatankhah
dc.date.accessioned2026-02-06T18:34:02Z
dc.date.issued2018
dc.departmentDoğu Akdeniz Üniversitesi
dc.description.abstractIn this study, a bi-objective scheduling problem of a flexible robotic cell is considered aiming to a trade-off between cell's processes scheduling and the production cost. At the cell, machines are identical and parallel and in line. There is an input buffer for the raw materials and an output buffer for the products. A robot is in charge of loading and unloading of the items from the input buffer to machines and from machines to the out put buffer. The system is cyclic means repeats the same processes in every cycle. It is assumed that each machine processes one part in each cycle. A bi-objective mathematical model is presented to solve the problem, and as an alternative, an NSGAII is developed for large-sized problems. Several numerical examples are solved for examining the proposed mathematical model and NSGAII method.
dc.identifier.doi10.1007/s00170-018-1577-x
dc.identifier.endpage1091
dc.identifier.issn0268-3768
dc.identifier.issn1433-3015
dc.identifier.issue1-4
dc.identifier.orcid0000-0002-8207-2387
dc.identifier.orcid0000-0002-3316-1252
dc.identifier.orcid0000-0003-2933-0954
dc.identifier.scopus2-s2.0-85041604021
dc.identifier.scopusqualityQ1
dc.identifier.startpage1081
dc.identifier.urihttps://doi.org/10.1007/s00170-018-1577-x
dc.identifier.urihttps://hdl.handle.net/11129/11608
dc.identifier.volume96
dc.identifier.wosWOS:000428797500086
dc.identifier.wosqualityQ2
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherSpringer London Ltd
dc.relation.ispartofInternational Journal of Advanced Manufacturing Technology
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.snmzKA_WoS_20260204
dc.subjectFlexible manufacturing
dc.subjectFlexible robotic cell
dc.subjectCyclic scheduling
dc.subjectMetaheuristics
dc.subjectMulti-objective
dc.subjectNSGAII
dc.titleTrade-off between process scheduling and production cost in cyclic flexible robotic cells
dc.typeArticle

Files